Disclaimer:These drawings were prepared in major part by me in my capacity as a USACE employee. These projects are public information. Any unauthorized use or reproduction is strictly prohibited. All statements are my
own opinions as a private individual and do not necessarily reflect USACE views or policy. Due to government policy these three projects are the only recent ones I am allowed to show.
Main Projects List:
DHS Holding Facility, 2015.
Production Lead after Design Development.
DHS Checkpoint Complex Render, 2015.
Lead.
AIT Barracks Standard Design Concept, 5-Story and 3-Story. 2014.
Residential, 182,000SF. 90,000 SF.
Production Lead.
DHS Checkpoint Complex. 2013-2015.
Support. Production Lead after 95%.
AIT Brigade HQ Energy Model Standard Design, 2012-2013.
Office, 9,400 SF.
Production Lead.
Fort Lee AIT Brigade HQ, 2011-2013.
Office, 10,400 SF.
Production Lead after Design Development.
Fort Campbell 3-BCT UEPH Barracks, 2011.
Residential, 200,000 SF.
Junior Designer, BIM Modeler, Drafter.
Fort Hood 69th ADA Company Operations Facility, 2010-2011.
Warehouse, Office, 62,000 SF.
Junior Designer, BIM Modeler, Drafter.
Basic Training Battalion Headquarters, 2009-2010.
Office, 20,000 SF.
BIM modeler, Drafter.
Advanced Individual Training Barracks Standard Design, 2009.
Residential, 90,000 SF.
BIM Modeler, Drafter.
COPYRIGHT © 2020 STEFAN WEISSENSTEIN. ALL RIGHTS RESERVED.
Site best viewed in Firefox or Chrome.